SERVICE AREA · LOWER MAINLAND
Rigging and machinery moving in the Lower Mainland
We have no office on the coast. The crew travels in, clears the building or rigs the machine, and plans the leg that follows: the haul, the container, the railcar or the border crossing.
Where we reach
Metro Vancouver, the Fraser Valley and the Interior corridors
In Metro Vancouver that means Vancouver, Burnaby, Richmond, Delta, Surrey, Langley, the Tri-Cities and Maple Ridge. In the Fraser Valley we work east through Abbotsford, Mission and Chilliwack. From there the Interior corridors run up the Fraser Canyon and over the Coquihalla to Kamloops, the Okanagan and the Kootenays. Vancouver Island is a ferry or a barge away, and Service area covers the rest of Western Canada.



Where most jobs start
Here, deconstruction comes first
A tenant leaves. A plant closes. A receiver takes the keys, or an owner replaces a line. Either way the equipment has to come out cleanly, and somebody has to be able to say where each piece went. That work is deconstruction.
It starts with a walk through the building and a written plan: what comes out, in what order, what it weighs, and what the place must look like when we hand back the keys. Each piece is tagged and recorded before it moves an inch. So a receiver gets a list that matches the floor, a realtor gets a building that shows well, and a plant doing an upgrade has the old machine gone before the new one is at the door. What comes out is sold for its owner through equipment sales, held in warehousing, or shipped from the port.
The industry mix
What we move in the Lower Mainland
The coast makes things, packs them, stores them and ships them, and the equipment follows suit. In food and beverage plants it is tanks, vessels and process lines. In Surrey, Langley and Abbotsford it is fabrication and machining shops. Distribution and cold storage bring chillers, refrigeration plant and rooftop units, along with racking and conveyors. Then there are data centres and switchrooms, mechanical and electrical rooms tucked into dense, multi-storey buildings, and whole lines and plants moving from one site to another. There is more under What we move.
Three ways out
The port, the rail and the border
Getting a machine out of the building is half the job. The leg after it is planned at the same time, so we load the piece once and the carrier, the railcar or the ship takes it from there.
Port
Container, flat rack, break-bulk
A container loaded and sealed at the origin site. A flat rack, the open container base for what will not pass container doors. Or break-bulk: a heavy piece delivered to the terminal on its own cradle and shipped as it is. More on Shipping.
Rail
Trailer to railcar and back
When a machine leaves or arrives by rail, we make the transfer at the yard, between the trailer and the railcar or intermodal container. The trade calls it transloading. More on Transloading.
Border
South into Washington
Our own trucks do not haul across the border. We load the machine, price the haul with cross-border carriers, then book one and manage it. Customs documents go through licensed customs brokers and freight forwarders.
If you bought it at auction or on the Marketplace, we crate and ship it, including sales outside Canada, and manage the third-party riggers and transport. Equipment landing at the port or coming up from the south is set in place through Rig In. More on Logistics and on our reach into the United States.
Local conditions
Tight floors, wet weather and mountain passes
Space is the first problem. Shops share walls and docks. The floor is often a second storey or a mezzanine, and the way out is a ramp, a dock or a freight elevator. So specialty rigging is the normal case here, not the exception: skates, the low rollers a machine rides across the floor; gantries, frames that lift from above where no crane fits; toe jacks, the low jacks that get under a machine with no lifting points; and jack-and-roll, where the machine is jacked up, set on rollers and rolled out.
Then the weather and the roads. It rains here for much of the year, so pieces are shrink wrapped or crated before they leave the floor, not after they get wet. In the city, bridges and tunnels set the heights, the weights and the hours a load can move, so an over-dimensional haul is often a night move with pilot cars, the escort vehicles that run ahead and behind. In winter the Coquihalla and the Canyon close for weather and slides. We plan the date, the route and a buffer.



What leads here
What the Lower Mainland calls about first
Deconstruction and removal
Buildings cleared for sale, lease, receivership, closure or upgrade, with each piece on the record. Deconstruction · Removal · For decommissioning.
Specialty rigging and machinery moving
The tight-access, multi-storey, dock-and-ramp moves this region is built around. Specialty rigging · Machinery moving · Site moves.
Shipping, transloading and crating
Containers loaded at origin, rail transfers, and cross-border freight on a carrier we book. Shipping · Transloading · Crating and shrink wrap.
Crane work is on Crane. Most of what leaves a floor, though, leaves on lift trucks.
FAQ
Questions we get
Do you have an office in Vancouver?
No. Our head office is in Edmonton, Alberta, with field offices in Crossfield and Grande Prairie. The crew travels to you, and the quote shows the travel.
Can you clear a whole building for a lease turnover or a sale?
Yes. We walk the site, write the plan, tag and record each piece, rig it out and leave the building clean. The equipment can be sold, stored or shipped on as part of the same job.
Can you load a container at our site instead of at the port?
Yes, and it is usually the better call. The pieces go in by lift truck or on skates in a planned order. Each one is blocked and lashed, and the stow is photographed before the seal goes on.
Our machine is on a second floor with only a freight elevator. Is that a problem?
No, it is common here. We check the elevator's rated load and door size first. Where it will not do, we use skates, gantries, a stair-climber or a crane through an opening.
Do you move equipment into the Interior and to the Island?
Yes. Interior moves are dated around winter road conditions. Vancouver Island is reached by ferry or barge, and the crossing is written into the plan.
Got a building to clear on the coast?
A machine on a mezzanine or a whole building to hand back: email sales@rigout.ca and tell us what has to move.