


ENGINEERING · REINSTALLATION
Reinstallation
Putting a plant back is mostly decided before the first truck arrives. We plan the new site first, then set the plant to the as-built drawings and hand it over to run.
How it goes back
Planned first, then built
New-site layout
The plant is fitted to the new building on paper first: clearances, access, utilities, foundations and anchor layouts.
Delivery sequence
Loads arrive in the order they go in. Each piece comes off the truck and goes into place, not into a corner to wait its turn.
Set and level
Each piece is set to the drawings, levelled, aligned and anchored. Licensed sub-trades make the connections, under your permits; we hire and manage them, and each connection is checked back to its tag. For new equipment, see Installation.
Recommissioning
Checks, start-up and handover, run with your operators and the licensed trades.
Equipment you bought
Recovered equipment, put to a new job
Bought a line at auction or out of a closure? We manage the rig out, the crating and the transport from the sale site, in Canada or abroad, including the third-party riggers and carriers. Then we check the line against the work you want from it, scope any shop changes and plan the restart before it arrives.






FAQ
Questions we get
Do you reinstall plants you did not take apart?
Yes. Where there is no record, we survey what arrives and draw it before it goes in.
Who makes the electrical, gas and pressure connections?
Licensed trades, not us. We are the general contractor on the install and run them, under your permits.
Who signs off the foundations and anchors?
Where sign-off is required, our in-house engineer of record, within their scope.
Can you reinstall to a new layout?
Yes. The new-site layout is drawn first and checked against the as-builts before anything is set.
Got a plant that has to run again?
Tell us what is going in and where.
Email sales@rigout.ca.
