




WHAT WE MOVE · OILFIELD & PIPELINE
Oilfield sites, plants and pipeline facilities
Well sites, batteries, compressor stations, gas plants and pipeline facilities. We take the iron down, haul it off the lease and set it again. The plan is the licensee's; the hands are ours.
The load
Heavy iron, a live site and a long road out
Some of it is coming out for good. Some is going back to work on another lease. Either way, the site is treated as live until it is proven dead. The order does not change from one site to the next: isolate, test, tag, rig, haul and set.



Well sites and batteries
Separators, treaters, tanks and pumpjacks
Most of it sits on a skid and was set by crane, so it comes off the same way it went on. A battery often holds equipment that is fit to serve another site.
Compressor stations and gas plants
The heaviest single pieces
A compressor package is the item most often moved rather than scrapped. The lift is planned around its frame and its lugs, and where the road allows, it travels as one unit.
Process and treating plants
Vessels, towers, pipe racks and structure
Many connected pieces, each with a weight and a place in the sequence, inside a structure that may be coming down too. Before a steel member is cut free, whatever it holds up comes down first.
Pipeline facilities
Meter, valve and pig stations
These are the parts of a pipeline that stand above ground; pig stations are where cleaning tools are sent into and out of the line. Where the licensee's plan calls for line-pipe recovery, the exposed pipe is cut, lifted, bundled and hauled.
The boundary
The licensee's plan, our hands
It helps to be plain about who owns what. The licensee, the company that holds the well or facility licence, holds the regulatory obligations on an oil and gas site: abandonment, reclamation and the filings with the provincial energy regulator. Those stay with the licensee, and we do not take them on. We do the physical work under the licensee's plan, alongside the licensed trades who handle isolation and purging. Structural demolition within a scope runs under our in-house engineer of record through Engineering, and is set out in the quote.
How we move it
Test, tag, rig, haul and set
01 · Test
Signed off before the first cut
The owner and the licensed trades isolate, depressure and purge, and they sign each vessel off. That work is theirs, not ours. Environmental testing also comes before the first cut: residual hydrocarbons, sour gas, radioactive scale, asbestos and lead. Qualified professionals and accredited labs do the testing. We book them; we do not test.
02 · Tag
A kit with a map, not a pile of parts
Each piece gets a tag with its identity and where it is going. Every connection is match-marked, a paired mark on both sides of the joint, and photographed before it is broken. The licensee gets the record through Traceability.
03 · Rig
To the lugs the builder put in
Skids are freed from their piles and lifted level on all four points. Compressor packages, vessels and towers are crane work under a written lift plan. Our lift trucks carry skids across the lease to the laydown, the open ground where pieces are staged for loading.
04 · Haul and set
Around the road bans
Road bans do not negotiate. A spring ban can close a route to a loaded compressor package for weeks, so the heavy haul is planned around the bans and the permits, on our own trucks. At the new site we are the general contractor on the install. Skids are set, levelled, anchored and reconnected to the match-marks, and the licensed sub-trades we hire and manage make the tie-ins, under the owner's permits.
Where it fits
Moving on, or coming out for good
A relocation runs as a site and plant move. A site coming out for good runs as deconstruction, salvage first. Equipment with a next life goes to equipment sales, sold for its owner, or to refurb and repurpose. The rest goes to recovery or disposal, with a record of where it went. Hazardous material leaves with licensed carriers. More on Energy.
FAQ
Questions we get
Who holds the regulatory obligations on the site?
The licensee. We do the physical work under the licensee's plan, and the obligations stay where they are.
Do you isolate and purge the equipment yourselves?
No. Isolation, depressuring and purging belong to the owner and the licensed trades. Our crew breaks the first flange only after the vessel is signed off.
Can a compressor package or a battery be reused on another lease?
Often, yes. Pieces are tagged and match-marked before they are disconnected, so they can go back together the way they came apart.
When is the best time to move equipment off a lease?
Winter, as a rule, while the ground is frozen hard. Weight limits change with the season, and spring road bans can close a route for weeks. We plan the haul around the bans and the permits.
What is left on the lease when you are done?
Nothing of ours. We take our equipment and materials off the lease and hand the lease back to the licensee. Reclamation is not our work; it stays with the licensee and their reclamation contractor.
Got iron to get off a lease?
Tell us the site, what is on it, and whether it is coming out or moving on.
Email sales@rigout.ca.
