WHAT WE MOVE · COMPRESSORS & MECHANICAL
Compressors and mechanical
Compressors, air handlers, boilers, pumps and whole mechanical rooms. Our crew gets them off the pad, out through the building, onto our own trucks and set level at the next site.
The load
Heavier than it looks, and still wet
Air and gas compressors, air handlers, boilers, pumps, heat exchangers and the piping between them. One piece or the whole room. We also move chillers and refrigeration equipment.



01 · Weight
Low, off-centre and hidden
A compressor package carries its weight at one end. A boiler carries it in the shell and in the refractory, the heat-proof lining inside. The weight on the nameplate is the dry weight, and what sits on the pad is wet. We find the real centre of gravity before anything lifts.
02 · Fluids
Oil, glycol, water, fuel
Each one is drained, captured and documented before the move. The scope sets out who does the draining. A unit shipped wet leaks on the trailer, and the trailer has somewhere to be afterwards.
03 · Fragile parts
Coils, fins, controls
Coils and fins bend at a touch, and refractory cracks under shock. Gauges and sensor lines stick out exactly where a sling wants to run. We protect them, take off what can come off, and route the rigging around the rest.



How we move it
Isolate, plan the route, lift and set
01 · Isolation
Nothing live, hot or full
A licensed electrician locks out the power and a licensed gas fitter isolates the gas. They are licensed sub-trades that we hire and manage as general contractor, under your permits, unless the scope gives that work to your own licensed trades. Steam and hot water are cooled and drained, and air receivers, the compressed-air tanks, are vented to zero. Our own locks go on the points that matter to the lift, and we walk the isolation with you before the crew starts. See Safety.
02 · The route
The room decides the method
We measure the doors, corridors and stairs and check what the floor will carry. A pump goes out on a lift truck. A compressor rolls out on skates, the low rollers that slide in underneath. A boiler in a basement is specialty rigging. Anything leaving over the wall is a crane lift with a written plan.
03 · The lift and the haul
From the frame, not the sheet metal
We lift from the shipping lugs, or build the pick from the base frame where there are none. A pump skid lifts from the skid and never from the pump. On our trucks the piece is blocked and chained and its open connections are capped. For a long haul it is sealed under crating and shrink wrap.
04 · The set
Level, anchored and aligned
The piece is set on shims, the thin plates that take up an uneven pad, then levelled and anchored to the manufacturer's pattern. On a coupled pump or a belt-driven compressor we align driver to driven, the motor to the machine it turns, and record the readings. Licensed trades reconnect it, managed by us, and we stay through start-up. That is installation work.



Where it fits
Buildings, plants and lease sites
A mechanical-room move is usually part of a machinery move, a site move or an equipment removal ahead of a sale through equipment sales. Most of it is commercial and industrial, plus energy sites where gas compressors come off lease skids. Every piece carries its tag through Traceability. If you bought the piece at a sale and need it out, see auction rig-outs.
FAQ
Questions we get
Who does the lockout before you start?
A licensed electrician and a licensed gas fitter isolate the equipment first. We hire and manage them, unless the scope gives that work to your own licensed trades. We hang our own locks on the points that matter to the lift and walk the isolation with your representative before the crew starts.
Does the compressor or boiler have to be drained first?
Yes. Oil, boiler water, glycol and fuel are drained, captured and documented before the move. The scope sets out who does it.
How do you get a boiler out of a basement or an air handler off a mezzanine?
That is specialty rigging: jacking and rolling, a gantry over the piece to lift it from above, stair-climbers, or a floor opening you have agreed to. We measure the route at the site walk and pick the method from there.
The lifting lugs were cut off years ago. Can you still lift it?
Yes. We build the pick from the base frame, with cribbing, stacked blocking, under the structural members and not under the sheet metal or the coils.
Do you align the pump to its motor at the new site?
Yes. We align driver to driven and record the readings, because a pump set out of alignment eats its own bearings.
Got a mechanical room to empty?
Send us the nameplate, a few photos of the room and where it is going.
Email sales@rigout.ca.