Rig Out Get a free quote →
Insulated pipe and a stainless duct run along a green-floored mechanical mezzanine.A row of freestanding electrical switchgear cabinets and a dry-type transformer stand on pallets inside a room still framed in unfinished sheathing board.A heat-recovery chiller plant: modular chiller units under large insulated pipe mains in a mechanical room.

ENGINEERING

Engineering

If your plant is going back together somewhere else, it has to be recorded before it comes apart. We survey it as it stands, draw the as-builts and plan the reinstallation at the new site.

Survey to restart

Four parts, one record

Plant survey and reverse engineering

We record the plant while it still runs: the layout, the connections and the order it was built in. Every piece gets a tag and a match-mark, a mark made across a joint so the two halves line up again.

As-built drawings

Drawings of what is actually there, which is rarely what was first designed. They become the plan for rebuilding it.

Reinstallation

The new site is laid out before the first truck arrives. Then we act as general contractor on the install: we set the plant, and we hire and manage the licensed sub-trades that connect it, under your permits.

Condition assessments

A written condition and recovery assessment. It says what the equipment is, what state it is in and whether it is worth moving.

Why it matters

Reassembly works from the record

The survey sets the order the plant comes apart. The as-builts set the order it goes back. The crew that takes it down is the crew that puts it up, reading the same drawings and the same tags at both ends.

Insulated process piping and mechanical plant packed tight above a ceiling level, standing in place ahead of rig-out
An insulated tank with a bank of wall-mounted drive panels and insulated piping in a mechanical room
A tall yellow fibreglass pressure vessel beside a stainless bag-filter housing and white poly tanks in a mechanical room.

Sign-off

Professional sign-off where it is required

Designs, lifts, foundations and structures that fall within the scope of our in-house engineer of record are signed off by them. Other disciplines go to licensed professionals we bring in. Electrical, gas and pressure connections are made by licensed trades, which we hire and manage under your permits.

A chiller module sits under insulated overhead piping beside a yellow caged ladder in a mechanical room.
A white insulated condenser-water return pipe with a flow arrow rises beside a cabinet unit in a mechanical room.
Insulated tanks, red valves and a curved cable tray overhead in a mechanical room, with a ladder against the tank.

FAQ

Questions we get

Do we need the original drawings?

No. Where they exist we use them, and we check them against what was actually built. Where there are none, the survey draws them.

Can the engineering be booked on its own?

Yes. You can book a survey, an as-built set or an assessment without booking the move.

Who keeps the drawings?

You do. The as-builts and the tag register are handed over to you with the job.

Who signs off where sign-off is required?

Our in-house engineer of record, within their scope.

Got a plant that has to go back together?

Tell us what the plant is, where it is and where it is going.

Email sales@rigout.ca.

sales@rigout.ca
CallEmailFree quote