WHAT WE MOVE · PRODUCTION LINES & PLANTS
Production lines and plants
Whole lines and whole plants, taken apart, moved and set to run again. One crew and one plan, with our own trucks and lift trucks.
The load
Hundreds of pieces that work in one order
Packaging and bottling lines. Processing lines with their vessels, pumps and skids. Fabrication, machining and robot cells. Belt, roller, chain and overhead conveyors. Palletizers, wrappers and case packers. And the plant around them: mechanical and electrical rooms, compressed air, racking and mezzanines. We move single machines too, from CNC and machining to tanks and process. A line is a different job, because the pieces have to come out together and still belong to each other afterward.



Sequence
It only goes back one way
A line was built in an order and set to fixed reference points on the floor. Take it apart without writing down both, and the move-in turns into a redesign.
Weight
Many pieces, uneven weights
The same line holds a heavy filler and conveyor sections a lift truck carries two at a time. So there is no one way to lift "the line". Each piece gets its own pick.
Fragile parts
The parts that decide start-up
The smallest parts decide whether the line starts again: sensors, encoders, drive cabinets and HMIs, the operator screens. They come off, get padded and crated, and do not ride the road bolted to the frame.
Deconstruction
How a plant comes apart
A plant comes apart in the reverse of the way it was built. That is deconstruction: surveyed, labelled and recorded, so each piece can run again on another floor or go on to its next owner.
01 · Survey and label
Record the line as it runs
We survey the layout and its reference points, and list every piece with its weight, dimensions and lift points. Then every piece and every connection is labelled and match-marked, a paired mark on both sides of the joint, before it is split. The labels follow the piece to the new floor.
02 · Isolate
Every service, zone by zone
Isolation is licensed work, and it is not ours. Licensed electricians lock out the panels. A licensed gas fitter isolates the burners. Air and hydraulics are bled to zero and proven. Our locks go on the points that protect each day's lifts, and we walk the isolation with the owner's representative at the start of each zone. Anyone on the crew can stop the work, under our safety system.
03 · Take it down
The reverse of the install
Controls and instruments come off first. Then piping and cable. Then conveyors and small machines, which clears the route. Then the heavy pieces, each with a truck placed to receive it. Lift trucks carry the heavy machines. Skates, the low rollers that slide in underneath, roll what forks cannot reach. A crane takes anything that has to leave over the wall.
04 · Phase it
Keep the plant running
Where production cannot stop, the job runs in phases as a site move: one zone comes down and ships while the next keeps running. The boundary between live and dead is marked on the floor, and it is held.
Haul and set
Many loads, one record, set to run
A line is many truckloads. Pieces are crated, skidded and wrapped by zone, and the loads are built in install order, so what is needed first comes off first. The people who took the line down load it, haul it on our own trucks and land it. Each piece carries its tag through Traceability, so you can see where each part of the line is. If the new building is not ready, the line waits indoors in warehousing and is released in install order.
At the new site the layout is marked out on the floor from the survey. Machines are set, shimmed level and anchored. Conveyors go back in line and on grade, because a conveyor set a little off at one end is a jam at the other. On the install we are the general contractor: the licensed sub-trades we hire and manage land power, air, gas and controls to the labels, under the owner's permits, and we stay through start-up. That is installation work.



Where it fits
Moving on, or coming out for good
A line moving to a new home is a machinery move at scale. A line coming out for good runs as equipment and plant removal, with the machines going to equipment sales, sold for their owner, or to refurb and repurpose. Most of this work is industrial. More on what we move and how a job runs.
FAQ
Questions we get
Can we keep part of the plant running while the line comes out?
Yes, where the plan allows. The job runs in phases: one zone comes down and ships while the next keeps running.
How do you make sure the line goes back together the same way?
We survey the line while it is still running, then label and match-mark every piece and connection before it is split. The labels follow the piece to the new floor.
What comes out first?
The last things that went in. Controls and instruments, then piping and cable, then conveyors and small machines, then the heavy pieces.
The new building is not ready yet. Where does the line go?
Into warehousing, indoors. It is received against the crate list and released in install order, and each piece keeps its tag.
Who reconnects and starts the line?
We set, level and anchor the machines and align the conveyors and drives. Power, air, gas and controls are landed to the labels by licensed sub-trades that we hire and manage, under your permits. We stay through start-up.