Two yellow industrial robots from a production line, strapped down on a flatbed trailerA stainless gummy production line set out in a clean white processing room: cooking tanks, depositor and cooling tunnel.A stainless packaging line with a multi-head weigher, capper and conveyors in a clean packing room.A bottle and jar packing line with labeller and conveyor set out in a white room.A stainless wraparound labeller with its touch screen and conveyor in a clean packing room.

WHAT WE MOVE · PRODUCTION LINES & PLANTS

Production lines and plants

Whole lines and whole plants, taken apart, moved and set to run again. One crew and one plan, with our own trucks and lift trucks.

The load

Hundreds of pieces that work in one order

Packaging and bottling lines. Processing lines with their vessels, pumps and skids. Fabrication, machining and robot cells. Belt, roller, chain and overhead conveyors. Palletizers, wrappers and case packers. And the plant around them: mechanical and electrical rooms, compressed air, racking and mezzanines. We move single machines too, from CNC and machining to tanks and process. A line is a different job, because the pieces have to come out together and still belong to each other afterward.

An insulated tank with a bank of wall-mounted drive panels and insulated piping in a mechanical room.
A wide empty cleared warehouse floor with steel columns and a long finished wall beyond.
A blue press brake machine sitting outdoors in a snowy yard behind a fence.

Sequence

It only goes back one way

A line was built in an order and set to fixed reference points on the floor. Take it apart without writing down both, and the move-in turns into a redesign.

Weight

Many pieces, uneven weights

The same line holds a heavy filler and conveyor sections a lift truck carries two at a time. So there is no one way to lift "the line". Each piece gets its own pick.

Fragile parts

The parts that decide start-up

The smallest parts decide whether the line starts again: sensors, encoders, drive cabinets and HMIs, the operator screens. They come off, get padded and crated, and do not ride the road bolted to the frame.

Deconstruction

How a plant comes apart

A plant comes apart in the reverse of the way it was built. That is deconstruction: surveyed, labelled and recorded, so each piece can run again on another floor or go on to its next owner.

01 · Survey and label

Record the line as it runs

We survey the layout and its reference points, and list every piece with its weight, dimensions and lift points. Then every piece and every connection is labelled and match-marked, a paired mark on both sides of the joint, before it is split. The labels follow the piece to the new floor.

02 · Isolate

Every service, zone by zone

Isolation is licensed work, and it is not ours. Licensed electricians lock out the panels. A licensed gas fitter isolates the burners. Air and hydraulics are bled to zero and proven. Our locks go on the points that protect each day's lifts, and we walk the isolation with the owner's representative at the start of each zone. Anyone on the crew can stop the work, under our safety system.

03 · Take it down

The reverse of the install

Controls and instruments come off first. Then piping and cable. Then conveyors and small machines, which clears the route. Then the heavy pieces, each with a truck placed to receive it. Lift trucks carry the heavy machines. Skates, the low rollers that slide in underneath, roll what forks cannot reach. A crane takes anything that has to leave over the wall.

04 · Phase it

Keep the plant running

Where production cannot stop, the job runs in phases as a site move: one zone comes down and ships while the next keeps running. The boundary between live and dead is marked on the floor, and it is held.

Haul and set

Many loads, one record, set to run

A line is many truckloads. Pieces are crated, skidded and wrapped by zone, and the loads are built in install order, so what is needed first comes off first. The people who took the line down load it, haul it on our own trucks and land it. Each piece carries its tag through Traceability, so you can see where each part of the line is. If the new building is not ready, the line waits indoors in warehousing and is released in install order.

At the new site the layout is marked out on the floor from the survey. Machines are set, shimmed level and anchored. Conveyors go back in line and on grade, because a conveyor set a little off at one end is a jam at the other. On the install we are the general contractor: the licensed sub-trades we hire and manage land power, air, gas and controls to the labels, under the owner's permits, and we stay through start-up. That is installation work.

Press brakes, a shear and a plate roll chained down on a lowboy trailer beside a shop building
A white heavy tractor hauling crated cargo on a flatbed trailer beside a shop building.
Shrink-wrapped compressor units and white steel frames squared and strapped on a multi-axle trailer behind a picker truck at dusk.

Where it fits

Moving on, or coming out for good

A line moving to a new home is a machinery move at scale. A line coming out for good runs as equipment and plant removal, with the machines going to equipment sales, sold for their owner, or to refurb and repurpose. Most of this work is industrial. More on what we move and how a job runs.

FAQ

Questions we get

Can we keep part of the plant running while the line comes out?

Yes, where the plan allows. The job runs in phases: one zone comes down and ships while the next keeps running.

How do you make sure the line goes back together the same way?

We survey the line while it is still running, then label and match-mark every piece and connection before it is split. The labels follow the piece to the new floor.

What comes out first?

The last things that went in. Controls and instruments, then piping and cable, then conveyors and small machines, then the heavy pieces.

The new building is not ready yet. Where does the line go?

Into warehousing, indoors. It is received against the crate list and released in install order, and each piece keeps its tag.

Who reconnects and starts the line?

We set, level and anchor the machines and align the conveyors and drives. Power, air, gas and controls are landed to the labels by licensed sub-trades that we hire and manage, under your permits. We stay through start-up.

Got a line that has to move?

Send us the line or the plant, where it sits and where it is going.