Rig Out Get a free quote →
A row of horizontal pressure vessels with access platforms, process towers and a flare stack at a gas facility under a light sky.A row of vertical storage tanks with caged ladders on a concrete containment pad at a gas facility.Two pumpjacks and their well-site buildings on a snowy lease against a stand of spruce and aspen.Horizontal separator vessels and grey process piping under a steel pipe rack at a gas facility.Gas compressor buildings with large cooler fans, exhaust stacks and a tower behind them at a facility under a blue sky.

SECTORS · ENERGY

Energy

Well sites, batteries, compressor stations, gas plants and pipeline facilities, taken down or moved to work again. One crew plans the lifts and the heavy haul, under the licensee's plan.

WHAT WE DO ON AN ENERGY SITE

From shutdown to a clean lease

Facility decommissioning

Well sites, batteries, compressor stations and gas plants taken out of service in a planned order, under the licensee's plan.

Tear-out

Buildings, skids, vessels, piping and pipe racks dismantled and cleared. Anything worth saving comes out first, before the cutting starts.

Lease clean-up

The lease cleared of equipment, piping and debris, ready for the licensee's reclamation contractor.

Equipment rig-out

Compressors, separators, tanks and treaters disconnected, rigged, lifted and hauled. Each is tagged and match-marked, with paired marks across every joint, so it goes back together the way it came apart.

Refurb for sale

Recovered equipment refurbished, tested and sold on consignment for its owner. See Refurb and repurpose and Equipment sales.

THE WORK

Sites, plants and pipeline facilities, down or moved

There are two kinds of job here. A site coming out for good is taken down in a controlled order, salvage first, and the lease is left clean for the licensee's reclamation. A site moving on, whether a battery, a compressor package or a whole treating plant, is tagged, match-marked, lifted, hauled and set again on another lease. On that second lease we are the general contractor on the install and manage the licensed sub-trades that reconnect it, under the owner's permits. See Oilfield, plants and pipeline.

Deconstruction and removal run the dismantle. Site moves and Installation run the relocation.

What we don't do: the licensee holds the regulatory obligations, which are abandonment, reclamation and the filings with the provincial energy regulator. We do the physical work under their plan, alongside the licensed trades who handle isolation and purging, which means shutting a line off and clearing it of gas.

Insulated process piping rising through a black steel pipe rack at a gas facility under a blue sky.

CRANE, RIGGING, TRUCKING, LIFT TRUCKS

Heavy pieces, remote sites

Nobody builds a compressor station close to anything, least of all a good road. So an energy job is heavy single pieces at the end of a long drive. Crane work lifts compressors, pressure vessels, towers and tank sections once they are isolated and cut free. Rigging plans each lift, and handles the skids, pumps and switchgear that come out without a crane. Trucking runs the heavy haul from the lease, planned around road bans, permits and the state of the access road. Lift trucks handle skid-mounted equipment in the yard. We lift a piece only after it has been de-energized and verified.

A drone view of a snow-covered wellsite with a pipe rack and wellhead equipment in long winter shadows
A metal-clad equipment building and an insulated tank tied into piping on steel supports at a wellsite
A control valve and grey process piping inside a metal-clad equipment building

WHERE THE DISCIPLINE COMES FROM

Compressor moves and abandonments

The depth in oilfield work is our people's. It comes from compressor moves and support on well and facility abandonments. That work teaches planned lifts, controlled de-energization and schedules set by a site that is still live.

RECORDS AND SALVAGE

Regulated iron, documented and given a next life

Pressure vessels, piping and structural components need more than a bill of lading: a chain of custody and QA/QC material traceability. Traceability keeps that record. Environmental testing comes before the first cut. It is done by qualified professionals and accredited labs that we book, and it tells us how the iron can be handled and where it can go. Where the structure itself has to come down, that work runs under our in-house engineer of record, through Engineering.

Salvage runs first. Equipment with life left goes through Refurb and repurpose or Equipment sales and the Rig Out Marketplace, and we crate and ship it for the buyer. Sales can offset part of the cost of the job. The rest goes to disposal with a record of where it went.

A row of freestanding electrical switchgear cabinets and a dry-type transformer on pallets inside a room framed in unfinished sheathing board
A long service corridor lined with electrical panels and teal-painted equipment cabinets

GEOGRAPHY

Western Canada, from three offices

Energy sites are rarely near a city, so the crew travels with the job. We work across Western Canada from our head office in Edmonton and field offices in Crossfield and Grande Prairie. Grande Prairie covers the Peace region. Crossfield covers Calgary and southern Alberta. Beyond that is a corridor into the United States, where a Rig Out crew has disconnected and removed switchgear from an auction floor. See Service area and Reach.

FAQ

Questions we get

What energy facilities do you deconstruct or relocate?

Well sites and batteries, compressor stations and gas plants, process and treating plants, and pipeline facilities including meter, valve and pig stations (where the cleaning tools that run through a pipeline are launched and received), with line-pipe recovery where the licensee's plan calls for it.

Who holds the regulatory obligations?

The licensee: abandonment, reclamation and the filings with the provincial energy regulator. We do the physical work under their plan.

Is the site taken down or moved?

Either. A site coming out for good is taken down salvage first and the lease left clean for reclamation. A site moving on is match-marked, hauled and set again on another lease.

When is anything lifted?

Only after it has been de-energized and verified. Lifts are scheduled against the isolation plan, with licensed trades handling isolation and purging.

Where does your energy experience come from?

From our people. Their oilfield work was compressor moves and support on well and facility abandonments.

Got a site coming out, or moving on?

Tell us what's on the site, whether plant, battery, pipeline or well, and whether it is coming out or moving on.

Email sales@rigout.ca.

sales@rigout.ca
CallEmailFree quote