Stage 04 · Rig In · Set, connect and start up
Rig In
Rig In is the install. We meet the equipment at the receiving site, set it and run the job as general contractor, managing the licensed sub-trades that connect it under your permits, through to start-up. Hire it with a rig-out ahead of it, or without one.
ASK FOR IT ON ITS OWN
You don't need a rig-out first
Putting equipment back is the other end of our deconstruction work: what we take apart, we can put back together. You can also hire Rig In by itself. If your equipment is already bought, crated and on its way, we meet the truck at your site and take it from the trailer to start-up. If it is still sitting at the seller's, we take out, crate and ship auction and Marketplace purchases too.



THREE SCOPES
Set it, start it, or the whole job
Place and install
Off the trailer and onto the pad: placement, levelling, alignment and mechanical installation. A crane for rooftop units and tight sites, lift trucks for the plant floor. The last metre goes on skates, the low rollers a machine rides across the floor, or under a gantry, a lifting frame that straddles the load. Foundations, anchor points and clearances are checked before the piece is set down. Better to find a bad measurement before the piece is on the pad than after.
Commission
Installation carried through to start-up, under your permits and through inspection by the authority having jurisdiction, the body whose inspector signs off the work. Licensed trades reconnect the utilities, which are function-tested in the sequence they were isolated in when the asset came out.
Turnkey, or any level in between
The whole install, with every trade on one schedule. Or just the set and alignment, or anything between. You choose where our scope ends and yours begins. Where engineering sign-off is required, our in-house engineer of record provides it within their scope; other disciplines go to licensed professionals we bring in.
ANY SCALE
From one skid to a whole facility
It can be one machine off the trailer, set, aligned and started. It can be the equipment side of a line retool, timed against a facility still running around it. Or a whole plant brought back on line bay by bay. Businesses relocating use it. So do purchasers with an auction lot to start up, and receivers with a sale condition to meet.
WHAT ARRIVES WITH THE ASSET
Refurbished, planned and on the record
Between the dismantle and the install, an asset can go through Refurb and repurpose, and Engineering plans its next service life before the first anchor bolt is set. The traceability record built through Capture, Rig Out and Logistics is handed over with the machine. The last entry in it is the install and commissioning.

SCHEDULE
The receiving site sets the schedule
Equipment that shows up before the pad is ready or the power is live just sits in the yard. So the install date follows the site's readiness, not the truck's. When we also move the load, both ends are on one schedule: the truck leaving the old site is timed to the crane or lift truck waiting at the new one.
EARLIER IN THE CHAIN
Rig In is where it goes back to work
An asset is planned in Capture, taken apart in Rig Out and moved in Logistics. Rig In is the stage where it runs again. All four are on How it works.
Got equipment landing at your site?
Tell us what's arriving, where it's landing and how far you want us to take it.