Rig Out Get a free quote →
LVL-framed walls stripped back to bare studs during a plant strip-out, with the removed foam panels stacked down the corridor.

COMPANY · HOW WE WORK

How we work

Three rules, one record and the same order of work on every site, from one machine on a lowboy (the low-deck trailer for tall loads) to a whole plant coming out.

THE DISCIPLINE

Three rules on every job

Salvage first.

Before anyone picks up a torch, we work out what is worth recovering. Value comes off first; structures come down after, safely.

One accountable company.

One company answers for the dismantle, the rigging, the haul and the reinstall. If something goes sideways along the way, you already know who to call.

Confidential by default.

We don't name a job, a client or a site without your written OK. NDAs, private communication and unmarked site visits are standard.

A wide empty plant floor with bare concrete and steel columns after the process equipment has been removed.
Removed fixture strips, conduit and a roll of insulation laid out on a plant floor beside a long interior wall.
A wide elevated view of a plant floor with a bench of staged lots and one distant worker.

TRACEABILITY

Chain of custody you can check

A documented chain of custody travels with each asset, from the day it is tagged to the day it is handed over. The file shows who held what, and when.

You get these five parts on every job where they apply: a serialized asset register, the chain of custody, disposal and diversion records with certificates, a photo and condition record per asset, and quality-control material traceability and registration. See Traceability.

ON SITE

The same order, every site

The site is walked before cutting starts. Utilities are isolated before anything is disconnected. A lift is planned before a load is on the hook. Loads are secured before a truck moves. PPE (the protective gear each person wears) is set per site and per scope. None of it makes for a good story afterwards, which is the idea. Every lift is a critical lift: see Safety.

STRAIGHT GOODS

We say what a job needs

Where a lift plan or a structural assessment needs professional sign-off, it runs under our in-house engineer of record, within their scope. Other disciplines go to licensed professionals we bring in. Either way, it is in the quote before the work starts.

Our crews' background is on About.

Got a site to hand over?

Tell us what has to come out and where it is going.

Email sales@rigout.ca.

sales@rigout.ca
CallEmailFree quote