ABOUT · SAFETY

Everyone clear of the load.

People get hurt on a lift when they are under the load. So each lift is planned on paper, run by one signaller inside a marked zone, and any worker on it may stop it.

QUALIFICATIONS

Insurance, safety and qualifications

Work under the Rig Out brand is covered by our operating company’s WCB account, liability insurance and Certificate of Recognition (COR) safety program, and its trucks hold a carrier safety fitness certificate. Current certificates are sent with every quote. You can also ask for them at any time at sales@rigout.ca.

A yellow crane boom lifts a steel frame on rigging lines against a clear blue sky above a building roofline.
A mobile crane boom lifts a cooling unit on slings above a rooftop with a vent stack in the foreground.
A crane boom angled against a deep blue dusk sky holds a steel frame on slings over a snowy horizon.

Lift planning

Every lift is a critical lift

No small picks, no quick ones. Each lift gets the full written plan, a supervisor present and a signed sheet before the hook goes on.

EVERY LIFT

Planned as critical

It can be one machine coming off its skid or a tower coming off a roof. The plan is the same plan.

NAMED IN THE PLAN

Anything that adds risk

A weight that is estimated. A high share of rated capacity. A blind lift, where the operator cannot see the load. A tandem lift, where two machines share it. A load near a power line. A floor we have not confirmed. Each one is written into the plan, along with how it is controlled.

ENGINEERED

Our engineer of record in the loop

Some parts of a lift need engineering: improvised or new lift points, a lifting beam that is not a commercial product, a load shared between two machines, a floor or roof of unknown capacity. Our in-house engineer of record designs or signs off that part, within their scope, before the lift is scheduled. Other disciplines go to licensed professionals we bring in.

The plan is written at the estimate, not on the morning of the lift. That puts the planning, the engineering and any hired crane into the schedule and the price. If something changes on the day, the lift stops and the plan is rewritten.

The written lift plan

What the plan has to say

The plan starts with the net weight and where that number came from, with a margin added when it is an estimate. The rigging, the spreader bar that holds the slings apart, the hook block and any attachments are added to reach the gross load. Capacity is read from the chart for the exact configuration, at the worst point along the path. The plan draws that path, names the signaller, sizes the exclusion zone and says where the load is set down if the lift is called off. Every number carries its source.

Before the pick

Check, meeting, trial lift

The gear

Every sling, shackle, hook and below-the-hook device (lifting gear that hangs under the hook) is marked with its rating and inspected before use. A piece that is unmarked or damaged is tagged out (taken out of service). So is one that falls short of capacity at the sling angle it will really work at.

The meeting

Everyone on the lift goes through the plan together: the weight, the sequence, the zone, the signals and the all-stop word. If a question goes unanswered, the lift waits until it is answered.

The trial lift

The load comes clear by a hand's width and stops there. The crew reads the load indicator against the plan and checks the balance. If it reads over, the load is set back down and the lift is planned again.

The zone and the signaller

One marked zone. One voice.

  • Zone sized first. Fall-over radius, swing, tail swing and a margin. It is barriered and signed before the load leaves the ground.
  • Clear under and between. A machine on jacks, on skates (the low rollers it rides across a floor) or on rollers counts as raised. If anyone steps in, the load holds until they are out.
  • One signaller. Named on the plan, wearing a hi-vis colour kept for the signaller, and using standard crane hand signals.
  • Radio when blind. The crew moves to a dedicated channel, and silence means stop and hold. The operator takes direction from the signaller alone, and takes a stop from anyone.

Field cards and stop-work

A card in every pocket, and anyone can stop the lift

Field cards

Each safe work practice is a written procedure, and each procedure ends in a one-page field card: what to check, what to do and what not to do. There is a card for each lifting method, for each class of machine we move, for setting a machine at the new site, and for securing machinery for the road.

Stop-work authority

Any worker may stop the lift. The reason can be a weight with no source, a sling that looks wrong, ground that is settling, wind above the limit, a person in the zone, a radio gone quiet, or plain doubt. The lift resumes only once the plan has been fixed.

Load securement

The lift is not finished until the load is chained

  • Securement gets the same written method as the lift, worked from the same weight and centre of gravity.
  • The machine sits on sound dunnage, the blocking between it and the deck. It is blocked and chocked, with a direct chain at each corner as a minimum, and more are added until the tie-downs meet the rule for that weight.
  • The lead rigger and the driver walk the load together, and both sign.
  • The driver checks it again early in the trip and at set intervals after that. More on Heavy haul and hotshot trucking.
Press brakes, a shear and a plate roll chained down on a lowboy trailer beside a shop building.

What it means for you

A slower first hour, a cleaner job

Planning takes time at the front of a job and gives it back at the end. If a lift needs engineering sign-off, a hired crane or another day, you hear it at the estimate. The plan also leaves room for floors, soil and weather. The same discipline runs through Rigging, Crane and How we work.