WHO WE SERVE · PLANT UPGRADES

Plants replacing or upgrading equipment

Old line out, new line in, and the plant still making product around it. The crew that takes the old equipment apart is the crew that rigs the new equipment into place, to one plan and one finish date.

ONE PLAN

Old out, new in, one contractor

An upgrade is two jobs sharing one patch of floor. The old line has to leave before the new one can land, and the gap between the two is where a schedule slips: an installer standing by for a floor that is not clear, and a plant that is down while everyone waits. So we take removal and installation as one scope. The removal is planned against the new equipment's footprint, delivery date and services. The install is planned against what is coming out.

A forklift carrying a green press brake onto the deck of a flatbed trailer.
A wide elevated view of a plant floor with a bench of staged lots and one distant worker.
Removed fixture strips, conduit and a roll of insulation laid out on a plant floor beside a long interior wall.
Boxed goods, pallets and equipment staged as lots in a large shop bay with overhead doors.

THE OLD LINE

Removed clean, then sold

Licensed trades disconnect the power, gas, air and controls. Then we rig the old equipment out, in an order that protects three things: the floor, the services the new line will use and the production running beside us. Anchors are cut. Pits and trenches are left the way the new install needs them. The footprint is handed over clean. Where the line is heavy or the building is tight, the method is deconstruction: cut, lift and carry out in pieces sized to fit the route out, not the other way round.

The old line is still your equipment, and some of it is worth money. Through Equipment sales we tell you in writing what each piece should bring and where to sell it: in place, from our yard, at auction, or as scrap. Sales can offset part of the upgrade cost, and the sale route, fees and payout are agreed in writing first. A machine that still runs comes out in one piece.

THE NEW LINE

Received, rigged, set and levelled

A new machine shows up when it shows up, and the floor is ready when it is ready. The two dates seldom agree. So we receive the equipment, hold it under cover if the dates do not line up, uncrate it and carry it to the footprint once the floor is clear. Our own lift trucks do the work inside the building, and a crane is brought in where a piece has to come through the roof. We are the general contractor on the install. We set, level, align and anchor to the vendor's drawings, and we hire and manage the licensed electrical, gas and controls sub-trades through hook-up and start-up, under your permits.

Moving a whole shop in from another site? See Site and plant moves.

PHASING AND SHUTDOWNS

Worked around production, planned to the hour

We phase the plan so one cell, one bay or one end of the line is worked while the rest keeps producing. Barriers, dust control and travel routes are agreed with your supervisors, who know where the lift trucks and the people cross. Each phase ends with the floor swept and the area handed back, so a shift can start in it the next morning.

Some changes need the plant down, and there is no talking around that. We plan that window to the hour. Everything that can be done ahead is done ahead: new equipment uncrated and staged, rigging gear laid out, the route cleared. Every lift is a critical lift with a written plan. Our in-house engineer of record signs off the lift plans and floor-load checks within their scope before the window opens, and other disciplines go to licensed professionals we bring in. Crews are sized to the window, and we schedule the trades alongside. We work nights and weekends, and you have the plan in writing before the shutdown.

THE RECORD

Each piece accounted for

Each piece removed and installed is tagged, photographed and recorded. For the old assets, that is where each one went and what it brought. For the new ones, it is the condition and set position of each at handover. See Traceability.

FAQ

Questions we get

Can the removal and the installation be one contract?

Yes, and that is how we take it: one scope, one plan, one crew and one finish date.

What happens to the old line?

It is removed, and sold for you where it has value. We tell you in writing what each piece should bring and where to sell it, before the work starts on it.

What if the new equipment arrives before the floor is ready?

We receive it, hold it under cover, and carry it to the footprint when the floor is clear.

Who makes the connections and starts it up?

Licensed electrical, gas and controls trades, under your permits. The setting, levelling, aligning and anchoring is ours.

Got an old line in the new one's way?

Tell us what is coming out, what is going in and when, at sales@rigout.ca.