A mobile crane's hook block and slings rigged to a rooftop cooling tower unit ahead of a lift.A close view of ductwork elbow joints with mastic-sealed seams above a cable tray and PVC piping.A long dry room with its air-handling units set out in a row along a raised steel platform, ready to be disconnected and lotted.

Stage 02 · Rig Out · Dismantle, crate and ship

Rig Out

Rig Out is the stage we're named for: equipment disconnected, taken out, crated and put on a truck. We do it for the owner clearing a site, and for the buyer who just bought a machine at auction, on the Marketplace or privately.

FOR BUYERS

You bought it. Now it has to come out.

Auction and Marketplace buys

Send us the lot number or the listing and where it has to go. We work to the sale's removal window. We take the machine out of the seller's building, crate or wrap it and ship it to your door.

Sales outside our area

Bought something elsewhere in Canada, or in another country? No need to find a rigger in a town you've never seen. We hire the local riggers and carriers, run them to our plan and keep the paperwork straight.

One quote, one person to call

That holds from the seller's floor to your dock. If the machine is going back to work, Rig In sets it up at your site.

A picker truck's boom holds a large wrapped tank inside a shop bay, seen from a second angle.
A wide empty cleared bay with yellow framed wall sections in the distance and bright overhead lights.
A long, bright room seen from one end with a gridded floor of low trays and tidy overhead ducting and pipework.

DECONSTRUCTION, NOT DEMOLITION

Taken apart to go back together

Deconstruction is our specialty. Because one company runs all four stages, we plan the dismantle backwards from the destination: how a piece comes apart is decided by how it ships and how it goes back together. Demolition ends with the piece on the ground. A rig-out has to leave it in shape to run again.

THREE DISCIPLINES

How a rig-out runs

Value off first, structure last

Before anything structural is touched, the equipment, materials and components worth recovering are assessed, protected and staged.

De-energize, disconnect, dismantle

Utilities are isolated, services disconnected, and process equipment comes out line by line. Licensed electrical and gas work goes to licensed sub-trades we hire and manage as general contractor, under your permits. Every lift is planned and rigged before the piece leaves its anchors, whether it is headed for redeployment, sale or scrap.

Scoped to the job

One machine, one line, one bay or a full facility. A single equipment move runs the same way as a full rig-out.

THE IRON ON THE FLOOR

Rigging, lift trucks, crane, trucking

Four services carry a piece from its anchors to the trailer. We plan them together, so the trailer is matched to the lift before the day.

Rigging

Machinery skates, the low rollers a machine rides across the floor. Toe jacks, the low jacks that get under a machine with no lifting points. Air bags, gantries and spreader beams. The load path is set before the piece is unbolted.

Lift trucks

Heavy-duty lift trucks, sized to the piece. Some are boom-equipped rigger units, lifting under a hook where a crane won't fit.

Crane

Crane lifts for rooftop units, heavy machinery and tight sites. Our crew plans the lift and rigs the load.

Heavy haul and hotshot trucking

Lowboys, the low-deck trailers for tall loads, and step-decks for heavy and oversize equipment. Hotshot is a smaller truck for one urgent load. The crew that rigged it loads, secures and hauls it.

ON THE RECORD

The record doesn't wait for the trailer

As each piece comes off the line it is tagged, logged and photographed in the condition it left in. The register is built as the work happens and travels with the piece to Logistics and Rig In. When the far end asks what shape it left in, the answer is a photo. See Traceability.

THE SPECIALTY

One method across four sectors

What has value leaves as an asset. What doesn't leaves as clean scrap. That holds in Industrial, Commercial, Agricultural and Energy. What changes is the hazards, the permits and the equipment. The method comes from oilfield work our people did on live sites, and has since run on industrial sites and in cultivation and agri-processing plants.

WHERE THE LINE SITS

When a rig-out isn't the whole answer

Some sites need more than recovery. Structural demolition, where a site needs it, follows the rig-out. Environmental testing of the ground and the iron comes before the first cut. We don't test: qualified professionals and accredited labs do, and we book them.

NEXT IN THE CHAIN

Once it's out, it moves

What comes out of the building goes through Logistics on its way to Rig In at the next site. If the job still needs a plan, start at Capture. If the asset isn't going back into service, Equipment sales sells it for you on consignment. All four stages are on How it works.