Rig Out Get a free quote →
Three air-handling units ride a multi-axle stretch trailer on a gravel road, with a pickup following behind.A white picker tractor with a rear-mounted knuckle boom leads a trailer carrying air-handling units on a gravel road.A heavy tractor hauling a large piece of equipment on a trailer under a cloudy sky.

RIGGING & MOVING · SITE & PLANT MOVES

Site and plant moves

We move whole shops, plants and facilities. The crew labels every piece, hauls it in phases on our own trucks and sets it running at the new address, with as few dark days, the days nothing gets made, as we can manage.

The job

Everything out, everything in, production back

A site move is not just a bigger machinery move. Three things decide it: the order things go in, how long production sits dark, and whether every piece turns up where it belongs.

A white tractor with its picker crane stowed behind the cab, beside a shop wall.
A white tandem-axle tractor with a folding picker crane parked beside a metal-clad shop.
A picker tractor in full side profile in front of a long metal-clad building.

01 · Plan

Inventory, layout, sequence

We walk both sites. Every asset gets a line on the list and a number, and the new layout is laid over that list. A piece has a destination before it has a lift. The order is set with your production people.

02 · Move

In phases, by the plan

The move runs in waves. Machines that go dark together travel together and go live together. The people who disconnect a wave also load it, haul it and set it.

03 · Move in

Set, connect, run

Each machine is set on its layout marks, levelled and anchored. Licensed sub-trades connect the power and services. We hire and manage them as general contractor, under your permits. The wave is handed back running, and then the next one starts.

Planning

Most of a site move happens before the first truck

Planning is where the downtime gets saved, well before anything is unbolted.

The asset list

Every item gets a line: what it is, where it is going, what it weighs, how it is lifted, who reconnects it and which wave it travels in. That list is the move. When the job is done, it becomes the traceability record.

The new site

Floors, pads, door sizes, dock heights, and power and air drops are checked against the list before the move starts. A door that is too low gets found with a tape measure, not with the machine sitting outside on the truck.

The trades and the paperwork

Electrical, gas, compressed air, controls and fire protection each need a licensed trade, and each trade gets a place in the sequence. Permits, inspections and utility shut-offs go on the list with their lead times.

A white picker truck with its crane folded beside a long metal-clad building.

Labelling

Every piece knows where it is going

A lost part doesn't cost you the part. It costs you the machine that can't run without it. So every machine, panel and bin of loose parts carries a label with its asset number, destination bay and wave. Cables and hoses are tagged at both ends. Fasteners are bagged and tied to the part they hold. Each item is photographed as found, as disconnected and as loaded. At any point in the move, you can ask for an asset by its number and find it.

A flatbed carries a tarped load at the front and blue steel process tanks strapped down behind it.

Phasing

Keeping the dark days few

A facility rarely has to stop all at once. Three patterns cover most cases.

Line by line

One line moves at a time, and it is running at the new site before the next one goes dark. Slowest on the calendar, easiest on production.

Shutdown window

The whole facility moves in one planned shutdown. Everything is staged, crated and labelled beforehand, so the window itself is lifting, hauling and setting only.

Staged through storage

When the new site is not ready, machines still come out on schedule and wait in storage at our yard. The old lease ends on time and nobody rushes the new building.

Hauling between the two sites runs on our own trucks.

What can go wrong

Three risks, and what we do about them

The new site is not ready

It happens. We check the new site against the asset list before the move starts, and storage stays in the plan as the fallback.

Something is lost or set wrong

A control panel in the wrong bay. A hose nobody can place. The label, the photograph and the list are there to catch it, and it helps that one crew carries each wave from disconnect to set.

The schedule slips

A trade runs late or the weather turns. The plan has spare days built in for that, the next wave is staged ahead, and you hear about a slip the day it happens.

The lifting risks are the same as on any rigging job, and so are the safety rules.

What you get

A facility that runs at the new address

A written move plan: the asset list, the sequence, the phasing and the planned downtime. One point of contact from the first disconnect to the last machine running. A record of every asset, where it went and how it was connected. The old site is left broom-clean, or handed to equipment and plant removal and deconstruction where more has to come out. For whole lines, see production lines and plants.

A white tractor with a folding picker crane and chrome stacks parked at a shop wall.
A white heavy tractor hauling crated cargo on a flatbed trailer beside a shop building.
Blue steel process tanks and crated parts chained and strapped across a flatbed trailer behind a tractor.
Two yellow industrial robots strapped down on a flatbed trailer beside a steel building, with a control cabinet and frame on the same deck.

FAQ

Questions we get

How long will production be down?

It depends on how the move is phased. Line by line loses the least production and takes the longest. A shutdown window moves everything in one go. Staging through storage lets the old lease end on time while the new site is finished.

Who reconnects power, gas and compressed air?

Licensed sub-trades. We book them into the wave plan, so they are on site when the crew needs them.

Do you handle the hauling between sites?

Yes, on our own trucks. Whoever disconnected a wave is there to load it, haul it and set it.

Whole shop changing address?

Email sales@rigout.ca.

sales@rigout.ca
CallEmailFree quote