WHAT WE MOVE · CNC & MACHINING
CNC and machining equipment
Machining centres, lathes, mills, grinders and EDM machines. We move them with the axes locked and the ways protected, then re-level them to the manufacturer's spec at the new shop.
The load
Heavy castings, light tolerances
A machine tool is a cast base, a column and a head. It also has a spindle and ways, the machined surfaces the axes slide on, and those cost more to repair than the whole move.
01 · Centre of gravity
High, offset and movable
The weight sits up in the column and head, or at the headstock end of a lathe. It also moves when the axes move, which is not something most loads do. So we park the axes where the manufacturer says, block them there, and rig to where the weight really is.
02 · Castings and ways
Surfaces we keep the rigging off
One sling dragged across a way, or one fork under the wrong rib, can cost a machine its accuracy. We cover the ways and secure the spindle. Slings, forks and chains stay off the machined surfaces and off the sheet-metal enclosure.
03 · Tooling and accessories
Everything that is not the machine
A machine tool travels with a lot of luggage: tool changer, chip conveyor, coolant tank, bar feeder, rotary table, probes and the pendant. Each comes off, gets a tag, and is crated or secured for the trip.



How we move it
Disconnect, lift, haul and re-level
01 · Before the lift
Fluids, power and locks
Coolant and oils are drained and the sumps cleaned, so nothing sloshes or leaks on the road. A licensed electrician disconnects the power and labels each cable at both ends. Your people back up the control, and the transport locks go back on. Who does what is agreed at the site walk.
02 · The lift and the path
Out past the other machines
We lift from the builder's points with a spreader beam, which holds the slings apart. Where there are no points, we go in at the base with toe jacks, the low jacks that get under a machine, and skates, the low rollers it then rides on. Our lift trucks handle most machine tools. Tight shops are specialty rigging, and through the roof is a crane lift.
03 · On the road
On its base, chained low
The machine rides the way it stood. The chains go at the base, never over a casting or a way cover. It is wrapped against grit and road salt, or crated under crating and shrink wrap, and our own trucks haul it. If the new shop is not ready, it waits indoors in warehousing.
04 · The set
Re-levelled and checked
The machine is set on its pads and levelled with a precision level to the manufacturer's spec. Then the geometry is checked: the axes square to each other, and the spindle square to the table. Power, air and coolant go back on through licensed sub-trades. All of that is installation work.





Where it fits
Shops, plants and the next owner
Most machine tool moves are industrial: job shops, machining plants and maintenance shops. A whole shop is sequenced as machinery moving or a site move, so the machines land in the order you need them running. A shop that is closing runs as equipment and plant removal, recorded under Traceability and passed on through equipment sales. Bought your machine at a sale? See auction rig-outs.
FAQ
Questions we get
Will my machine still hold tolerance after the move?
The method is built around that question. The axes are locked, the rigging stays off machined surfaces, and the machine is re-levelled to the manufacturer's spec. If it was laser-checked before the move, the same check afterwards shows you how it arrived.
What do we need to do before you arrive?
Back up the control and park it. The draining, the disconnect by a licensed electrician and the capping of the air lines are agreed with you at the site walk.
Do you move the tool changer, chip conveyor and coolant tank too?
Yes. They come off, get tagged, and are crated or secured for the trip, so they arrive with the machine they belong to.
The machine has no lifting lugs. Can you still move it?
Yes. The lift is planned from the base, with toe jacks and skates under the pads. Cribbing, which is stacked blocking, goes in at every stage so the machine is never held on hydraulics alone.
Who levels and reconnects it at the new shop?
We are the general contractor on the install. We set and level the machine and check the geometry. We also manage the licensed sub-trades that reconnect power, air and coolant and handle the anchors and grouting, under your permits.