ENGINEERING · PLANT SURVEY

Plant survey and reverse engineering

This is a survey of your plant before it moves, not a copy of anyone's machine. Before anything is disconnected, we record the plant as it runs: where everything sits, how it connects and the order it was built in. That record is what lets it go back together.

What we record

The plant as it stands today

Layout and elevations

Where each piece of equipment sits, measured on site: positions, centrelines, clearances, floor levels and anchor points.

Connections

Every pipe, duct, cable and control connection, identified and tagged at both ends, so nobody is left holding a loose end and guessing.

Process and controls

Flow paths marked up on your existing drawings, or drawn new where there are none. Instruments and control panels are listed.

Condition at removal

A photo and a condition record for each piece, taken before it moves.

Runs of pipe carried on strut along a plant ceiling
Insulated tanks, red valves and a curved cable tray overhead in a mechanical room, with a ladder against the tank
An insulated tank with a bank of wall-mounted drive panels and insulated piping in a mechanical room.

Tag and match-mark

So each piece goes back where it came from

Each machine, section and joint gets a tag and a match-mark, a mark made across a joint so the two sides line up again. Both are logged against the drawings. The tag register travels with the load and is checked off at the new site.

Dismantle sequence

The survey sets the order

A plant comes apart in the reverse of the order it goes back. So we work out the sequence from the survey before the first connection is broken. The same record feeds the as-built drawings and the deconstruction plan.

Insulated pipe and a stainless duct run along a green-floored mechanical mezzanine.
A long service corridor lined with electrical panels and teal-painted equipment cabinets.
A long packaged air-handling unit with copper and steel piping runs along the wall of a building mechanical room.

FAQ

Questions we get

The plant has been modified over the years. Does that matter?

Most plants have been, and that is why the survey is done on site. It records what is there now, not what the old drawings say should be there.

Do you need the plant shut down to survey it?

Usually not. Most of the survey can be done while the plant runs, and the rest is scheduled with your shutdown.

Who keeps the survey?

You do. The drawings, the tag register and the photo record are handed over with the job.

Can the survey be booked without the move?

Yes. A survey and its drawings can be booked on their own.

Got a plant to record before it moves?

Tell us what the plant is and when it has to come out.