One crew. Four stages.
Every job runs the same four stages: Capture, Rig Out, Logistics and Rig In. The same people plan all four, so the dismantle already knows about the trailer and the install.
THE CHAIN
Plan, dismantle, move, install
The same tools go the whole way. The rigging that takes a machine off its anchors sets it down on the next pad. The lift trucks and crane that load the trailer also unload it.
You can take one stage or all four. A plant owner might need only Rig Out and Logistics. An auction buyer might need Rig Out, Logistics and Rig In. A receiver might need the whole chain.



STAGE 01 · PLAN
Capture
First we look. What equipment is there, where does it sit, what state is it in and what is worth moving? Then we settle how it comes out, where it goes and who owns what. Capture is planning. It is not an offer to buy your equipment.
STAGE 02 · DISMANTLE
Rig Out
The equipment is de-energized and disconnected, with licensed trades doing the licensed disconnects, then removed, salvage first: the pieces of value are identified and protected before anything is cut. This is deconstruction run as a recovery job, whether it is one machine or a full plant. If you are a buyer, we take out, crate and ship what you bought at auction, on the Marketplace or privately, and we manage local riggers and carriers where the sale is outside our area. The equipment comes out on rigging, under a crane or on a lift truck sized to the piece.
STAGE 03 · MOVE
Logistics
Packaging, rigging, heavy haul and hotshot trucking are run as one scope, with customs paperwork through licensed customs brokers. Hotshot is a smaller truck for one urgent load. The people who took the piece down decide how it is packed and loaded, because a machine that came out nicely and doesn't suit the trailer is still a problem. In Western Canada it rides our own trucks. Cross-border loads go on a carrier we book and load ourselves. Every load-out follows a lift plan.

STAGE 04 · INSTALL
Rig In
On the install we are the general contractor. We place, level and anchor the equipment. The hook-ups are licensed work, so licensed sub-trades do them: we hire and manage them, under your permits, through commissioning and inspection by the authority having jurisdiction, the body whose inspector has to pass the work. Take it turnkey or any level short of that. Rig In doesn't need a rig-out ahead of it. If your equipment is already bought and on its way, we can meet the trailer and take it from there to start-up.
THE BOUNDARY
Where our engineer of record signs off
Some stages need an engineer's sign-off. Our in-house engineer of record provides it, within their scope. Disciplines outside that scope go to licensed professionals we bring in.