WHAT WE MOVE · ESCALATORS & ELEVATORS
Escalators and elevators
Escalator trusses, elevator machines, cabs, counterweights and rails. The trade belongs to the licensed elevator contractor. The rigging is ours: the pick into the building, the move across the floor and the set. Each job is looked at on its own and planned with the equipment maker, the owner and the licensed elevator contractor.
The load
Long, heavy, and one opening to get through
These pieces have to pass through a finished building and land on their supports exactly where the drawings say.
01 · Escalator trusses
Stiff one way only
A truss is a welded frame as long as the rise it climbs. Lift it from the wrong points and it twists. So we rig from the manufacturer's lift points with a long spreader beam, which holds the slings apart, and we tail the low end, steering it on its own line, so the truss comes in at the angle the opening needs.
02 · Elevator equipment
Machines, cabs, counterweights, rails
A traction machine is compact and dense, and it often goes in through a roof opening. A cab is rigged by its sling, the frame that carries it, and never by its panels. Counterweight fill, the steel plates that weigh down the counterweight, moves as counted stacks. Rails are banded and staged where the elevator mechanic wants them.
03 · The building
The opening is the whole plan
It may be a removed curtain-wall panel, a roof hatch, an atrium or a loading dock. The owner's contractor and engineer size it and shore it. The floor loading under outriggers, the legs a crane stands on, or under gantry legs is confirmed with them before anything is set down.



How we move it
Plan with the mechanic, pick, walk it in and set
01 · Who does what
Their trade, our rigging
When we run the job, we schedule the licensed elevator contractor alongside the other trades. They hold the elevating-device permits. They align, wire and commission the equipment, and they direct any rigging inside the hoistway, the shaft the elevator runs in. By law, only they install or adjust it. We plan the lift with them.
02 · The pick
Crane or gantry at the opening
A crane lift is worked out on paper first: where the crane sits, the radius, the ground under the outriggers and the path past the facade. On the day there is one signaller, an exclusion zone below, and protection on the edges of the opening. Where no crane can reach, a gantry, a frame that lifts from above, does the lift.
03 · The set
Landed, rolled in and jacked down
The piece lands on rollers or skates, the low carriers that let it roll, and walks across the floor. Jacks and cribbing, which is stacked blocking, lower it onto its supports a little at a time. Where there is no opening at all, it travels in sections through the freight route, under specialty rigging.
04 · Removal and transport
Out in reverse
Old equipment leaves whole, or it is cut into sections under a hot-work plan, the written permit for torch cutting, as equipment removal. Trusses ride on our own trucks, blocked and chained at the frame. Machines and controllers are crated, and anything that arrives early waits indoors in warehousing.




Where it fits
Malls, transit, offices and plants
Most escalators and elevators are in commercial buildings: shopping centres, transit stations, airports, office towers, hospitals and hotels. In a plant it is the freight elevators and material lifts, and the work is often part of a larger plant upgrade. Where a building is being cleared, the equipment comes out under deconstruction.
FAQ
Questions we get
Do you install escalators and elevators?
No. The licensed elevator contractor installs the equipment, commissions it and signs it off. We rig it into and out of the building and set it on its supports for them.
Who do you work for, the owner or the elevator contractor?
Either. We can work under the elevator contractor as their rigging crew, or directly for the owner or the general contractor.
Can a truss come in if the building is already closed in?
Often, yes. We assess the building on the site walk. The ways in are a removed curtain-wall panel, a roof opening, an atrium or a loading dock. Failing those, it comes in sections through the freight route.
Do you cut up the old truss or take it out whole?
Whichever the opening and the finishes allow. We make that call with you on the site walk.
What do you need from us to quote?
The equipment drawings, or the manufacturer's weights and lift points. The building drawings around the opening. And the elevator contractor's dates.