A cooling tower cell hangs airborne from a mobile crane's boom on red and yellow rigging slings against a clear blue sky, a rooftop lift caught mid-air.A row of large air-handling units and ductwork lines a mechanical room corridor.A long dry room with its air-handling units set out in a row along a raised steel platform, ready to be disconnected and lotted.

RIGGING & MOVING · INSTALLATION

Installation

New equipment or relocated, we run your install as general contractor. We set, level, align and anchor the machine, and we manage the licensed sub-trades that connect it, under your permits. The crew that delivers it installs it.

What installation covers

Set. Level. Align. Anchor.

Four jobs, done in that order, each one checked before the next begins.

A rooftop cooling tower swings on crane rigging straps against a clear sky, viewed from below.
A packaged air-handling unit with white piping on a green-painted mechanical room floor.
A chiller module sits under insulated overhead piping beside a yellow caged ladder in a mechanical room.

01 · Set

Off the trailer, onto the pad

Our lift trucks handle most plant floors and a crane handles rooftops. The last few metres indoors go on skates, the low rollers that sit under the base, and a gantry, a frame that lifts from above. The piece lands on its layout marks, not near them.

02 · Level

Shimmed, not guessed

Precision levels go on the machine's own reference surfaces. Steel shims and levelling pads go under the base until it reads true, and the readings are recorded.

03 · Align

Shafts, belts and lines

Coupled shafts are aligned to the maker's tolerance. Soft foot, a foot that isn't sitting flat on the base, is corrected first. Conveyors and lines are aligned section to section so product tracks.

04 · Anchor

Bolted to the pad it was designed for

Anchors go in to the maker's pattern and the engineered anchor design. Where a base needs grout, the fill between base and pad, we hold the machine level and coordinate the pour and the cure before the final torque.

A yellow crane boom lifts a steel frame on rigging lines against a clear blue sky above a building roofline.
A crane boom angled against a deep blue dusk sky holds a steel frame on slings over a snowy horizon.
A large cooling-tower module sits secured on a multi-axle lowboy trailer in an open yard under a clear blue sky.

Before the piece arrives

The pad, the path and the drawing

Most installation problems can be caught a week early. A pad that hasn't cured. An anchor pattern that doesn't match the machine. Power on the wrong wall. So we walk the receiving site before the machine ships and check the drawings against the building as it stands. Where we also took the machine out of its last site, its dimensions, weight and lifting points are already on record.

The trades

We set it. Licensed trades connect it.

Electrical, gas and controls connections are licensed work, and licensed trades do them. Our part is bringing them in at the right time and in the right order.

Electrical

The disconnect location and the cable route are agreed before the electrician arrives. A licensed electrical contractor does the work, in the sequence we set.

Gas and process piping

Flanges and stubs are positioned and supported so the fitter can make up to them without forcing anything. The licensed trade connects and tests.

Controls and commissioning

Panels, sensors and safety circuits are connected and proven by the controls technician or the maker's service people. We are on site when they power up.

The trade sequence is set at the start, because grouting a machine before the pipe fitter has seen the flange means moving it again.

New or relocated

Set once, to the maker's pattern

We install new equipment and equipment relocated from another site, from a single machine up to a whole line. Putting a whole plant back together from its tag register and as-built drawings has its own page, Reinstallation. It is the second half of a machinery move or a site move.

Start-up support

Installed means running, not standing

First run

Licensed trades energize the machine and the owner accepts it. We stay for that first run. Vibration, or a coupling that walks, shows up in the first hour, while the crew is still on the floor to correct it.

Settle and re-check

Floors move under a new load, and grout cures. Where the maker calls for it, we come back to re-check level and alignment and re-torque the anchors.

Handover record

What was set and where, to what level and alignment, with what anchors, and who connected what. It is one document, and it stays with the equipment's file.

What we install

Machine tools to whole lines

It is the same equipment we move: CNC and machining centres, fabrication equipment, compressors, boilers and pumps, chillers and refrigeration, tanks and process skids, and whole production lines. Where a job needs a stamped drawing, an anchor design or a floor-loading check, our in-house engineer of record does it within their scope, through Engineering. Other disciplines go to licensed professionals we bring in.

A press brake secured on a lowboy trailer under a blue sky
Main electrical switchboard sections strapped on a flatbed trailer at a loading dock.
An insulated tank with a bank of wall-mounted drive panels and insulated piping in a mechanical room.
A cooling tower rigged to a crane hook with a red spreader bar and slings, sitting on a rooftop curb against an open blue sky, with a worker standing clear at the right.
A crane hoists a large rooftop cooling tower into place while two workers guide it from a rooftop platform.
A mobile crane boom lifts a cooling unit on slings above a rooftop with a vent stack in the foreground.

FAQ

Questions we get

Do you do the electrical and gas hook-ups?

We manage them, and licensed sub-trades make the connections. We set, level, align and anchor the machine, and we agree cable routes and flange positions beforehand, so no trade arrives to a surprise.

What does "installed" mean to you?

Set where the drawing says, level, aligned to what it drives or feeds, anchored and connected. A machine sitting on a pad is not installed. It is parked.

Do you grout machine bases?

Where a base needs grout, we set and level the machine and hold it on its jacking bolts. Then we coordinate the pour and the cure, and the final torque comes after.

Do you stay for start-up?

Yes. We stay for the first run under power. Where the maker calls for it, we come back to re-check level and alignment and re-torque the anchors.

What should be ready before the machine arrives?

A cured pad, an anchor pattern that matches the machine, a clear path in from the door and power on the right wall. We walk the site with the drawings before the machine ships.

Got a machine on the way?

One machine to set or a whole line to put back together: email sales@rigout.ca.