RIGGING & MOVING · INSTALLATION
Installation
New equipment or relocated, we run your install as general contractor. We set, level, align and anchor the machine, and we manage the licensed sub-trades that connect it, under your permits. The crew that delivers it installs it.
What installation covers
Set. Level. Align. Anchor.
Four jobs, done in that order, each one checked before the next begins.



01 · Set
Off the trailer, onto the pad
Our lift trucks handle most plant floors and a crane handles rooftops. The last few metres indoors go on skates, the low rollers that sit under the base, and a gantry, a frame that lifts from above. The piece lands on its layout marks, not near them.
02 · Level
Shimmed, not guessed
Precision levels go on the machine's own reference surfaces. Steel shims and levelling pads go under the base until it reads true, and the readings are recorded.
03 · Align
Shafts, belts and lines
Coupled shafts are aligned to the maker's tolerance. Soft foot, a foot that isn't sitting flat on the base, is corrected first. Conveyors and lines are aligned section to section so product tracks.
04 · Anchor
Bolted to the pad it was designed for
Anchors go in to the maker's pattern and the engineered anchor design. Where a base needs grout, the fill between base and pad, we hold the machine level and coordinate the pour and the cure before the final torque.



Before the piece arrives
The pad, the path and the drawing
Most installation problems can be caught a week early. A pad that hasn't cured. An anchor pattern that doesn't match the machine. Power on the wrong wall. So we walk the receiving site before the machine ships and check the drawings against the building as it stands. Where we also took the machine out of its last site, its dimensions, weight and lifting points are already on record.
The trades
We set it. Licensed trades connect it.
Electrical, gas and controls connections are licensed work, and licensed trades do them. Our part is bringing them in at the right time and in the right order.
Electrical
The disconnect location and the cable route are agreed before the electrician arrives. A licensed electrical contractor does the work, in the sequence we set.
Gas and process piping
Flanges and stubs are positioned and supported so the fitter can make up to them without forcing anything. The licensed trade connects and tests.
Controls and commissioning
Panels, sensors and safety circuits are connected and proven by the controls technician or the maker's service people. We are on site when they power up.
The trade sequence is set at the start, because grouting a machine before the pipe fitter has seen the flange means moving it again.
New or relocated
Set once, to the maker's pattern
We install new equipment and equipment relocated from another site, from a single machine up to a whole line. Putting a whole plant back together from its tag register and as-built drawings has its own page, Reinstallation. It is the second half of a machinery move or a site move.
Start-up support
Installed means running, not standing
First run
Licensed trades energize the machine and the owner accepts it. We stay for that first run. Vibration, or a coupling that walks, shows up in the first hour, while the crew is still on the floor to correct it.
Settle and re-check
Floors move under a new load, and grout cures. Where the maker calls for it, we come back to re-check level and alignment and re-torque the anchors.
Handover record
What was set and where, to what level and alignment, with what anchors, and who connected what. It is one document, and it stays with the equipment's file.
What we install
Machine tools to whole lines
It is the same equipment we move: CNC and machining centres, fabrication equipment, compressors, boilers and pumps, chillers and refrigeration, tanks and process skids, and whole production lines. Where a job needs a stamped drawing, an anchor design or a floor-loading check, our in-house engineer of record does it within their scope, through Engineering. Other disciplines go to licensed professionals we bring in.






FAQ
Questions we get
Do you do the electrical and gas hook-ups?
We manage them, and licensed sub-trades make the connections. We set, level, align and anchor the machine, and we agree cable routes and flange positions beforehand, so no trade arrives to a surprise.
What does "installed" mean to you?
Set where the drawing says, level, aligned to what it drives or feeds, anchored and connected. A machine sitting on a pad is not installed. It is parked.
Do you grout machine bases?
Where a base needs grout, we set and level the machine and hold it on its jacking bolts. Then we coordinate the pour and the cure, and the final torque comes after.
Do you stay for start-up?
Yes. We stay for the first run under power. Where the maker calls for it, we come back to re-check level and alignment and re-torque the anchors.
What should be ready before the machine arrives?
A cured pad, an anchor pattern that matches the machine, a clear path in from the door and power on the right wall. We walk the site with the drawings before the machine ships.