Three jobs, stage by stage, with the photos to go with them. There are more in the job gallery.
MACHINERY MOVE · ALBERTA
A fab shop's heavy machines, moved as one job
Press brakes, shears and a plate roll: the machines that bend, cut and curve steel plate. Each came off the anchors that held it to the floor and was picked up with a boom lift truck. Each was set onto a lowboy or a step-deck, the low trailers for tall freight, and chained down for the haul. One crew rigged, lifted, loaded and hauled.


Services: Rigging, Lift trucks and Heavy haul and hotshot trucking. Sector: Industrial.



PROJECT · RUN ACROSS 2025
A cultivation facility, rigged out end to end
A whole facility: racked growing rows, benches, wall panels, mechanical and process systems. It was taken apart in order, staged, hauled and put back up at the receiving site. That took five phases, and here they are.
PHASE 1 · AS FOUND · FEBRUARY 2025
What we walked into
Full rows of racking several tiers high. Bench lines under fabric duct. Process piping overhead, and a mechanical level packed tight with HVAC and dehumidification. Before anyone turned a fastener, all of it was catalogued. You cannot put back what you did not write down.

PHASE 2 · STRIP-OUT · JULY 2025
Taken apart in order, not knocked down
Spiral duct came off the ceiling and wall panels off the corridors. Walls were opened where the route out needed them. Racking came down one bay at a time. The valuable things came off first and the structure last. Each system came out the way it went in, so it could go back in somewhere else.

PHASE 3 · RECOVER & STAGE · SEPTEMBER 2025
Bundled, palletized and staged to ship
This is the phase that decides whether equipment arrives as an asset or as damage, and it is mostly packing. Racking was bundled, equipment crated, wall panels palletized and bench frames strapped. Drives and pump manifolds went onto skids. The floor was set out in rows, sorted by system, so each truck could load what belonged together.
PHASE 4 · REBUILD & REINTEGRATE · OCTOBER 2025
The same kit, standing at the receiving site
The panels and frames that came off the walls in July arrived, were staged and went back up. Wall framing stood and rooms took shape. It was a facility built from recovered equipment instead of new.
PHASE 5 · HANDED BACK
An empty building, handed back
The building went back to its owner empty and swept. The equipment went back to work somewhere else.
PROJECT · ELSEWHERE IN 2025
A processing floor, recovered and consolidated
A shorter job from the same year. Process equipment, steel and panels were taken up, sorted and stacked together, so what was worth keeping stayed that way.
RELATED
The services behind these jobs
The two 2025 projects ran as Deconstruction and Refurb and repurpose, in the Agricultural sector. More jobs are in the gallery, and Reach shows where our people have worked.
Looking at a job like one of these?
Every job on this page started with somebody describing a building. Tell us what you're looking at.
Email sales@rigout.ca.