DECONSTRUCTION · REMOVAL
Equipment and plant removal
The equipment goes and the building stays, ready for what comes next. One crew sees it disconnected cleanly, rigs it off the pad, loads it out and sweeps the floor behind it.
Why equipment comes out
Sale, auction, upgrade or closure
Why the equipment is leaving decides how we handle it.
Sale
Sold to a buyer
The machine is packed to reach the buyer as it was sold. Loose parts are bagged and labelled, and finished surfaces are protected. The condition record at load-out shows the buyer what left the floor. Want us to sell it for you? See Equipment sales.
Auction
Lotted and ready for pickup
Equipment is removed, tagged by lot and staged where bidders can inspect it. Then it is loaded for the winning bidders on their dates. The auction house deals with one company.
Upgrade
Out, so the new one can go in
The old machine comes out when the new one arrives, often through the same door, around a shop that keeps working. Removal and installation are planned as one sequence. We set the new machine, and licensed trades connect it.
Closure
The whole plant, in order
Saleable equipment comes out first, protected and recorded. Then the rest, sorted. We work to the hand-back condition the landlord or the receiver sets in the lease or the sale.
The method
Record, isolate, rig
01 · Record
Tag it and photograph it
Before a wrench goes on it, every item gets a tag, a photograph and a condition note. If a buyer, an auction house or an insurer later asks what shape a machine was in, the answer is on file. That record is what we call Capture.
02 · Isolate
Locked out, drained and capped
Power, gas, air, water and process lines are isolated and proven dead before anything is disconnected. Electrical and gas disconnection is licensed work. Licensed sub-trades that we hire and manage as general contractor do it, under your permits. Our crew does the mechanical take-out. Fluids are drained to containers, and lines are capped and labelled at both ends.
03 · Rig
Off the pad, through the door
Anchors are cut or unbolted, and the machine is walked out along a path that was measured first. That is rigging, with lift trucks for the heavy pieces and a crane when the only way out is up.
Clean disconnect
Removed, not ripped out
A clean disconnect leaves the machine able to go back into service and the building able to take the next one. Cables come off at the terminals and are coiled, not cut. Hoses come off at the fittings and are capped. Hardware goes into labelled bags tied to the piece it came off. Guards and panels travel with the machine.
The surprises on a removal are predictable: a live hydraulic line, an undrained sump, a cable feeding something else, anchors deeper than the drawing. So we walk the site with your people and trace the services before anything is disconnected. See Safety for how we keep the crew out from under the load.
Load out
Onto the deck and gone
Each piece is loaded by the crew that lifted it, secured for the road and photographed again on the trailer. It leaves on our own trucks, with crating and wrapping for a long trip and warehousing if the next site is not ready. Moving the plant instead of selling it? That is a site move.
Where buyers send their own trucks, we stage the equipment, meet the carrier, load it and record what left and when. For buyers who would sooner have it handled, we crate and ship auction and Marketplace purchases and manage the riggers and carriers. That includes shipments leaving Canada, which go on carriers we book.

Site left clean
Handed back ready for the next use
Floor and anchors
Anchor bolts are cut flush or pulled. Holes are filled where you ask, and pits and trenches are covered or marked. The floor is swept and the pads are clear.
Waste and fluids
Drained oils, coolants and glycol go to a licensed waste facility. Scrap steel, cable, timber and packaging are sorted as they come off. Where it all went is on the record.
Process plant
Where the equipment handled chemicals, fuel or product, the space may need testing before hand-back. We do not test. Qualified professionals and accredited labs do, and we book them as part of the same job. See Environmental testing.
Removal or deconstruction
When the job is bigger than the equipment
Removal takes out the equipment and leaves the building. When the mezzanines, piping racks, ductwork and structure have to come out as well, the job is Deconstruction. Not sure which one you have? Send us photographs and we'll tell you. We remove the full range of equipment we move.



FAQ
Questions we get
What is the difference between removal and deconstruction?
Removal takes out the equipment and leaves the building. When mezzanines, piping racks, ductwork and structure come out as well, the job is deconstruction.
Who disconnects the power and gas?
Licensed sub-trades. We sequence their work, and our crew unbolts equipment only once it is isolated and proven dead.
Can you remove a machine while the shop keeps running?
Yes. On an upgrade the old machine comes out when the new one arrives, with removal and installation planned as one sequence.
Equipment out, building stays?