Specialty rigging
Some machines sit where no lift truck or crane can get at them. We bring them out of basements, off mezzanines and across roofs on jacks, skates, gantries and stair-climbers, and we look after the building on the way through.
When it becomes specialty
The building decides, not the machine
On a standard rigging job, a lift truck or a crane has a clear way in. On a specialty job, it doesn't.



Think of a chiller in a basement plant room, a compressor up on a mezzanine, or a press boxed in at the back of a running shop with no path for a truck. Somebody got it in there once. The weight hasn't changed. What has changed is the room to work, the floor under the load and the number of stages it takes. So the piece moves a few inches at a time, on gear we carry in through the same doors people use.



The methods
Lift a little, move a little, block it, repeat
The load stays low. At each stage it is set down on blocking, so it never rests on hydraulics alone. Most moves use several of these four methods in turn.
Jack and roll
Toe jacks, the low jacks that get under a machine with no lifting points, raise the piece onto cribbing, which is stacked timber blocking. Skates, the low rollers a machine rides on, go underneath. Then it is pushed or winched along a set path and jacked back down.
Gantry systems
A portable gantry is a lifting frame that comes in through a door in pieces and is put together over the load. It lifts straight up, off a base or into a pit, in a room where no boom has space to swing.
Hydraulic skates and rollers
Low-profile skates and roller dollies put the weight on many wheels, not a few. Steerable sets get the piece round corners, and plates laid under them protect the slab.
Stair-climbers and ramps
A powered stair-climber walks a strapped load up or down one step at a time, with the operator on the uphill side. Where a stair won't do, we build a ramp or hoist the piece through a floor opening.
The crew also brings spreader beams, the beams that hold slings apart, along with air bags, chain hoists and timber cribbing. Where the path opens up, our lift trucks take the piece from there. Out in the yard, one of our picker trucks, a truck that carries its own crane, from our trucking fleet does the loading.

Tight access and multi-storey
Through the building, not around it
Most of this work happens inside occupied, running buildings. We measure every opening on the path: door widths, corridor turns, headroom and thresholds. If the machine is wider than a door, we look at what can come off it, or whether a door frame or wall section can come out and go back in. Before a freight elevator is used, its rating is checked against the piece plus the skates it rides on. With no elevator, the move goes up a stairwell or through a floor opening, one level at a time. If the day ends with the machine on a landing, it spends the night blocked and strapped, not sitting on skates.
Rooftop and mezzanine
Heavy equipment on light structure
A rooftop unit leaves by crane. First, though, it has to cross the roof from its curb, the raised frame it sits on, to the spot where the crane can pick it up. We keep the load over the beams, lay mats to protect the roof membrane, and free every anchor, duct and pipe before the lift.
Every mezzanine has a rated load, and we ask for it. Where it is unknown, the load is spread across more beams or lifted straight off the deck with a gantry. The rail comes down only when the load is ready and the exclusion zone below is set.
What can go wrong
Three risks, and how we control them
Tipping
We find the centre of gravity before the move, keep it low and brace anything that can't stand on its own. Any move on a slope gets a hold-back, a line that keeps the load from running away downhill.
Floor failure
Plates and timber spread the weight. Trenches and pits are bridged or avoided. An unknown floor is treated as weak until someone shows us otherwise.
Loss of control
At every stage the load is held by a chock, a hold-back or a winch under tension. One person calls the move. Anyone on the job who sees something wrong can say stop, and the move stops. See safety.
The plan is written before the crew arrives. Where a floor has to be assessed, our in-house engineer of record reviews it within their scope, through Engineering. Other disciplines go to licensed professionals we bring in.
What you get
The machine out, the building as you left it
A written method and sequence before the work starts. A crew that protects floors, walls and door frames, and puts back what it had to take out. Each piece is tagged and photographed on its way to the truck or its new pad. The same crew then hauls it on our own trucks, sets it under installation, or holds it in storage until the new room is ready.




FAQ
Questions we get
What makes a rigging job "specialty"?
The building, not the machine. It is a job where a lift truck or a crane has no clear way in: a basement plant room, a mezzanine, a roof, or the back of a shop past a door that is too narrow.
Can you move a machine that is wider than the door?
Often, yes. We measure every opening first. Then we look at what can come off the machine, or whether a frame or a section of wall can come out and go back in.
Can you use the building's freight elevator?
Only after its rating is checked against the piece plus its skates. The landing floors get checked too.
How do you protect the floor?
Plates and timber spread the weight, and trenches and pits are bridged or avoided. An unknown floor is treated as weak until someone shows us otherwise.