OUR SPECIALTY · DECONSTRUCTION
Deconstruction
We take plants apart so the good parts can go back to work. Our crew strips the equipment, rigs it out, hauls it on our own trucks and leaves the floor clean. Where the building comes down too, you are told up front who does which part.
The order of work
Value out first, structure last
We start with a salvage plan. Every machine, motor, panel and bundle of steel worth keeping comes out whole, tagged and staged, before anything is cut.
What comes out goes back to work. It is rigged out through Rigging. From there it moves to your next site, gets rebuilt through Refurb and repurpose, or is sold for you on consignment through Equipment sales. Sales can offset part of the cost of the job, and the sale route, fees and payout are agreed in writing. Only then does the structure come down.






Why Rig Out
One crew from first walk-through to clean floor
One plan
The people who walk the plant write the sequence and then run it. The stripping, the rigging and the hauling are our own work, so you deal with one contact.
Trucks and lift trucks
Trucks and lift trucks are on the job from day one, and they are planned alongside the work, not booked around it.
A record of where it went
Every piece is tagged and photographed on the way out. Disposal and diversion records, kept through Traceability, show where each load ended up.
Scope
What comes apart
First the process equipment, production lines and plant, on industrial and commercial properties. Then the interiors around them: walls, panels, mezzanines and partitions. Then the structure, to the ground where the scope calls for it, and below the ground where the scope includes foundations, containment or buried piping.
Isolation comes before all of it. Equipment is de-energized and proven dead before it is cut or pulled. Every lift is a critical lift, and it is planned as one.
The other direction
Taken apart to go back together
The crew that takes a line apart can put it back together at the next site: off the trailer, set, levelled, anchored and aligned. Because we know where each piece is going, we mark it, protect it and crate it for the install. Anchor points and the order of reassembly are recorded on the way out. So are the match marks, the marks made across a joint to show how two pieces line up. Nobody's memory is that good by the time the trailer is unloaded, ours included.
Installation through to start-up is Rig In.
Structural work
Two scopes, and who does each
Taking out equipment and taking down a building are two scopes. We plan and quote them separately, so each is priced on its own work. Structural work runs under our in-house engineer of record, within their scope, and they are named in the scope of work.
Some of it is not ours to do. Where a job needs a demolition licence or bonding we don't carry, we say so before the quote goes out, and a licensed demolition contractor we bring in does that part. Soil or material testing is arranged through Environmental testing.
Energy sites
Gas plants, oil batteries, pipelines and wells
The sequence does not change on energy sites. Recoverable equipment and material come out first, and the records travel with the work.






FAQ
Questions we get
What is the difference between deconstruction and demolition?
Deconstruction is salvage-first. Recoverable equipment, materials and components come out whole before any structure comes down.
Do you take the building down as well as the equipment?
Where the scope calls for it, yes: to the ground, and below it where underground infrastructure is included.
Can the same crew reinstall the equipment at the new site?
Yes. The crew that takes a line apart sets, levels, anchors and aligns it at the next site, working from the match marks and records made on the way out. Connecting it is licensed work. Licensed sub-trades that we hire and manage as general contractor do it, under your permits.
Who signs off on the structural side?
Our in-house engineer of record, within their scope.
Do you work on gas plants, batteries, pipelines and well sites?
Yes. The same salvage-first sequence applies on energy sites, with disposal and diversion records showing where everything went.
How is a deconstruction job quoted?
The quote is free, and bigger jobs start with a site walk. Equipment removal and structural deconstruction are scoped and quoted separately.
In short
What you get
Disconnect, dismantle, tag, crate and clear, with an inventory of every piece and a clean floor at the end.
Who’s in charge, and where it stops
The crew lead runs the day. Licensed trades we hire disconnect the services, qualified professionals and accredited labs we book do any testing, and hazardous material goes with licensed carriers.
Get one
Tell us what it is and where it has to go. Price and timing come in the quote.
Got a plant that has to come apart?
Tell us what has to come down, what has to come out first and where it goes next.
Email sales@rigout.ca.